Survey before spend
Nothing is specified until someone has walked the site with a meter and read the existing configuration. Coverage problems are usually walls, not access points, and half the switches quoted in a typical proposal are replacing hardware that was never the fault. The survey costs a day and routinely removes a five-figure line.